{"id":1379,"date":"2019-04-15T18:25:51","date_gmt":"2019-04-15T16:25:51","guid":{"rendered":"http:\/\/www.forshore-ports.com\/?post_type=avada_portfolio&p=1379"},"modified":"2024-08-05T16:59:32","modified_gmt":"2024-08-05T14:59:32","slug":"guillermo-brown-jetty","status":"publish","type":"avada_portfolio","link":"https:\/\/www.forshore-ports.com\/references\/guillermo-brown-jetty\/","title":{"rendered":"Guillermo Brown jetty"},"content":{"rendered":"

Argentina<\/strong><\/h2><\/h1><\/div>
<\/div><\/div><\/div>

Built to keep pace with the country\u2019s growing energy requirements, the Guillermo Brown thermoelectric power plant needed facilities to receive liquid fuel supplies. <\/span><\/p>\n

These are located at the Puerto Galv\u00e1n site and include a 17 km pipeline and an unloading quay. In November 2013, Siemens awarded the design-build contract for the jetty and associated berthing and mooring facilities to the SBA \u2013 JML UTE joint venture. The work consisted in building an ofshore trestle with a length of about 800 metres and a quay comprising four berths, an operating platform and four moorings.<\/span> <\/span><\/p>\n<\/div>

<\/div><\/div><\/div>

\"\" Owners<\/strong><\/span><\/p>\n

Siemens<\/span><\/p>\n

\"\" Main contractor<\/span><\/strong><\/p>\n

SBA \u2013 JML UTE (Soletanche Bachy Argentina<\/span>
\n\u2013 Soletanche Bachy International<\/span>
\n\u2013 Juan M. Lavigne y C\u00eda) joint venture<\/span><\/p>\n

 <\/p>\n<\/div>

<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":1993,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[33,39],"portfolio_skills":[],"portfolio_tags":[],"class_list":["post-1379","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-argentina","portfolio_category-latin-america"],"_links":{"self":[{"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/avada_portfolio\/1379","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/avada_portfolio"}],"about":[{"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/types\/avada_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/comments?post=1379"}],"version-history":[{"count":2,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/avada_portfolio\/1379\/revisions"}],"predecessor-version":[{"id":4078,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/avada_portfolio\/1379\/revisions\/4078"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/media\/1993"}],"wp:attachment":[{"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/media?parent=1379"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/portfolio_category?post=1379"},{"taxonomy":"portfolio_skills","embeddable":true,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/portfolio_skills?post=1379"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/www.forshore-ports.com\/wp-json\/wp\/v2\/portfolio_tags?post=1379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}