{"id":3078,"date":"2020-12-11T10:55:35","date_gmt":"2020-12-11T09:55:35","guid":{"rendered":"https:\/\/www.forshore-ports.com\/references\/quai-de-barranquilla\/"},"modified":"2024-08-05T16:38:28","modified_gmt":"2024-08-05T14:38:28","slug":"quai-de-barranquilla","status":"publish","type":"avada_portfolio","link":"https:\/\/www.forshore-ports.com\/fr\/references\/quai-de-barranquilla\/","title":{"rendered":"Quai de Barranquilla"},"content":{"rendered":"

.<\/p>\n<\/div>

<\/div><\/div><\/div><\/div><\/div>

Colombie<\/h1><\/div>
<\/div><\/div><\/div>

D\u00e9but 2019, Soletanche Bachy Cimas a livr\u00e9 le projet de r\u00e9paration et extension de 800 m de quai sur les rives du fleuve Magdalena \u00e0 Barranquilla pour le compte de Compas.<\/p>\n

Ce projet s\u2019est d\u00e9roul\u00e9 en deux grandes \u00e9tapes.<\/p>\n

Phase 1\u00a0:\u00a0R\u00e9paration des postes \u00e0 quai n\u00b03 et 4 du terminal Compas Barranquilla<\/strong><\/p>\n

Compas est la seule entreprise portuaire du pays, pr\u00e9sent sur les 2 oc\u00e9ans, disposant de 6 terminaux priv\u00e9s. Afin que le d\u00e9veloppement de ses infrastructures et que son d\u00e9veloppement commercial se poursuivent, Soletanche Bachy Cimas r\u00e9alise en 2018 les travaux de r\u00e9paration en conception-construction apr\u00e8s 4 ans de discussion.<\/p>\n

Le quai a \u00e9t\u00e9 r\u00e9alis\u00e9 et livr\u00e9 fin 2015 (par une autre entreprise que Soletanche Bachy), mais souffrait de d\u00e9fauts de conception et de qualit\u00e9 d\u2019ex\u00e9cution qui emp\u00eachaient sa pleine utilisation.<\/p>\n

Le bureau d\u2019\u00e9tude de Soletanche Bachy Cimas a donc redimensionn\u00e9 l\u2019ouvrage et les travaux de renforcement du quai se sont d\u00e9roul\u00e9s sur un d\u00e9lai court de 5 mois.<\/p>\n

Les travaux ont consist\u00e9 en\u00a0:<\/p>\n